Akron will complete project’s specifications and design drawings. Water drainage related tests to be performed by the contractor, in addition to the typical concrete tests (i.e. slump test, compressive strength test, air content, etc.) to ensure proper drainage and avoid pooling on the deck. During the construction phase, Akron will provide daily site visits and weekly reports.
Jubilee Centre, Stairs Replacement, RMWB
